Be sure the suspension wires are securely fastened.
Drop ceiling grid installation instructions.
Cut the main tees for the drop ceiling hangers.
Snap the chalk line tool to create this.
Screw an eyelet into every.
300mm 45 0 45 0 300mm 1 80mtr.
Literally measure and make a to scale drawing of each room.
Hanger wire can be suspended for ceiling installation.
Secure the end of a chalk line on one end of.
Install wall molding mark the desired new ceiling height on the wall.
Install two four foot cross tees between the two main beams in line with the first two border cross tees.
Install hanger wire or.
Measure and cut the main tees according to a cross tee guideline.
The cross tee slots must line up.
The measurements will be the same if the grid is square.
Suspended ceiling for 2 x 4 ceiling panels.
Then layout your tile spacing and see how it looks.
Step 1 design your drop ceiling grid it starts with a game plan.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Lift panel at angle through grid.
Slope 1 in 1 8mtr in any plane if more use counter splaying wires step 5.
Don t assume the wall is straight.
If the grid is not square shorten one of the main beams until the diagonals are equal.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Three easy steps to install your ceiling 1.
Drop into place a.
The main runners will support the.
Additional 2 cross tees dotted lines are installed parallel to the main tees 2 o c.
Join sections of main beam.
Determine the size of your border panels from side to side.
Quickhang instructions are notated by a gray background.
Measure across the diagonals of the 2 x 4 opening.
Check the original sketch of the room to determine this location.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
A b step install panels 3 2 x 2 installation 1.
Installation of hangers ceiling soffit duct section threaded rod hanger wire vertical support slotted bar main tee for suspending the ceiling.
Typical installation tee patterns 2 x 4 grid layout 2 x 4 tee layout 2 x 2 tee layout planning for 2 x 2 ceiling panels.
Trim border panels cutting panel face side up b.
Cut the main runners to fit the length of your room perpendicular to the joists.
Apply them to the ceiling with screw eyes screw hooks nails or by drilling.
If you are using 2 x 2 panels you need to lay out your grid differently.