Desco products of ct 203 932 2207.
Demolish terrazzo flooring.
You will be amazed as our process transforms your concrete or terrazzo floor to reveal a smooth surface designed to hold shine longer and prevent stain and moisture damage.
Removing a terrazzo floor is a bit trickier than other types of tile floors because the tiles themselves are so heavy and thick.
You will need to use a hammer drill which functions as a mini jackhammer to remove most ot the terrazzo.
Removing epoxy mortar with terrazzo under the epoxy.
See professionally prepared estimates for flooring removal work.
Floors gone more uses powerful grinding machines equipped with diamond grinding discs to remove any carpet glues mastics tile thin set or other coatings that may have adhered to the floor.
See typical tasks and time to remove flooring along with per unit costs and material requirements.
The cost to remove flooring starts at 1 26 2 46 per square foot but can vary significantly with site conditions and options.
You will have to decide when to stop between each change of grit by cleaning with water drying and comparing the patch to the rest of the floors.
After we are done we will restore the terrazzo floor by diamond polishing.
New terrazzo or newly restored terrazzo use upwards of 3500 grit to polish the floors.
The demolition of the terrazzo is not an easy task and needs to be cut all the way through detaching it around and from the areas which have to be saved before demo.
We are removing thin set from a terrazzo floor.
Get fair costs for your specific project requirements.
Your floor may not be that reflective.
Terrazo is basical a cement floor with a high polish you can scrape pretty agressivly and you can use paint remover wont hurt the terrazzo hocidw do you remove battery acid from terrazzo.
You also need someone that knows what and how to work with terrazzo and look at the cracks or other evident problems which probably need to be taken care of.
Demolition of floor structure on the ground floor made of plain concrete base d 8 cm waterproofing and thermal insulation d 5 5 cm plain concrete d 12 cm and finish terrazzo floor d 7 cm removal of debris out of the facility and transport to the building site landfill and then to the landfill designated by the investor to 15 kilometers away.